A 100 MW hydroelectric power plant project in Nepal

Apr 21,2025

  • Equipment Configuration: Feeder DHZG2019-06-109 ZSW3895, jaw crusher JC96, cone crusher GPY100, vertical crusher PLS700, vibrating screen 2YK548, vibrating screen 2YK1848, sand washer LX-610, classifier FG1200, 13 belt conveyors, etc.
  • Processing Materials: stone
  • System Scale: 100t/h
  • Construction Unit: Luoyang Dahua Heavy Industry Science & Technology Co., Ltd.

According to the system process diagram and on-site conditions of the 100 t/h Nepal hydropower project, Luoyang Dahua Company specially designed and provided a centralized control system to achieve centralized and automatic interlocking control of all equipment in the system. The system has a reasonable process design and high production efficiency.

Device Configuration

DHZG2019-06-109 Feeder ZSW3895, jaw crusher JC96, cone crusher GPY100, vertical crusher PLS700, vibrating screen 2YK548, vibrating screen 2YK1848, sand washer LX-610, classifier FG1200, 13 belt conveyors and a batch of non-standard parts.

Contact Us

Email :Alexandr@huazn.com

Phone/WhatsApp:
+7 903 008 6006

Address:
Moscow, Nizhegorodskaya Street 32s15, 4th floor, office 513